Efisiensi penggunaan lem pada proses assembling sandal Gibson TD di PT. Toezone Indo Bandung, Jawa Barat

Evita Nur Azizah, - (2019) Efisiensi penggunaan lem pada proses assembling sandal Gibson TD di PT. Toezone Indo Bandung, Jawa Barat. Tugas Akhir thesis, Politeknik ATK Yogyakarta.

[img] Text
Abstrak.pdf
Restricted to Registered users only

Download (276kB) | Request a copy
[img] Text
Cover.pdf
Restricted to Registered users only

Download (757kB) | Request a copy
[img] Text
Fulltext_2019_TPPK_1602041_Evita Nur Azizah.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

PT. Toezone Indo merupakan perusahaan yang bergerak dibidang industri manufacturing khususnya sepatu dan sandal anak, dalam memproduksi sepatu dan sandal terdiri dari beberapa proses, salah satunya proses assembling. Pada bagian proses assembling di PT. Toezone Indo terdapat masalah penggunaan lem yang kurang efisien saat proses pengeleman. Sehingga sisa lem hasil produksi akan mongering selain itu proses penggunaan lem hanya berdasarkan perkiraan (feeling) yang tidak ada aktualisasi angka sehingga penggunaan lem kurang efisien dan pada bagian PPIC kesulitan menghitung jumlah kebutuhan lem untuk assembling, sehingga akan sulit untuk mengontrol persediaan lem di chemical room. Pengamatan yang dilakukan di PT. Toezone Indo, Bandung Jawa Barat selama dua bulan. Materi yang diamati yaitu pada proses assembling sandal Gibson TD, metode yang digunakan adalah observasi, wawancara dengan staff yang terkait, dokumentasi dan studi pustaka berdasarkan hasil pengumpulan data didapatkan faktor penyebab dari permasalahan tersebut yaitu penggunaan lem yang kurang efisien saat proses assembling sandal Gibson TD. Solusi untuk mengatasi permasalahan yang ada yaitu dengan cara membuat pengaktualisasian angka penggunaan lem untuk proses assembling sandal Gibson TD, melakukan stock opname setiap hari di chemical room, memberikan perbaikan secara teknik tentang proses primering, pengeleman dan agar keluar masuk lem lebih terkontrol harus ada laboran yang bertanggung jawab atas chemical room. PT. Toezone Indo is a company who be a foot in manufactor industry, especially children shoes and sandal. There are some processes to make both, one of them is assembling process. The assembling process in PT. Toezone indo have a problem in use of glue which not efficienctly, in order that the leftover of glue will dry up. Moreover the give of glue process is not efficient and also PPIC section difficult to counting total need of glue for assembling process and it will difficult to control the give of glue stock in chemical room. This is research at PT. Toezone Indo belong two months with subject assembling process of sandal Gibson TD and use observation, interview, documentation and literature review methodology. Based on the result of data collected, we can conclude that there are causeactive factor problem from the give of glue in assembling process of sandal Gibson TD that not efficiently. The problem solve is make actualization number in use of glue for assembling process of sandal Gibson TD, do with technique about primering process and give of glue process, so suply of glue can more controlled also the chemical room official must be report responbility.

Item Type: Thesis (Tugas Akhir)
Uncontrolled Keywords: efisiensi, assembling, lem, sandal,
Subjects: Teknologi Pengolahan Produk Kulit > ALAS KAKI > SANDAL--PERAKITAN
Divisions: Teknologi Pengolahan Produk Kulit
Depositing User: intan - -
Date Deposited: 13 Aug 2019 06:38
Last Modified: 27 May 2020 04:21
URI: http://repository.atk.ac.id/id/eprint/173

Actions (login required)

View Item View Item